Loading
Yolo County Climate Action and Adaptation Plan
Loading
Skip to main content
+ Yolo County, California, Yolo County Climate Action and Adaptation Plan Front page+
Yolo County Climate Action and Adaptation Plan
en
English
Español
Home
About
Overview
Vision Statement
FAQ
Additional information
Share your story
Strategies
Decarbonize Transportation
Reduce Vehicle Miles Traveled
Decarbonize Energy and Buildings and Increase Energy Efficiency
Optimize Water Use
Minimize Waste
Reduce Off-Road Equipment Emissions
Support Climate Smart Agriculture
Sequester and Store Carbon in Natural and Working Lands
Reduce Carbon Footprint of Consumption and Production
Resilient Infrastructure and Healthy Communities
Actions
Take Action!
Search
en
English
Español
Loading
Organizations
Yolo County
/
General Services Department
Yolo CAAP
Yolo County Climate Action and Adaptation Plan
Responsible in 32 actions
ID
Action title
Implementation phase
Information updated
DT1a
Install electric vehicle (EV) charging stations at County facilities to facilitate the use of County-owned EVs.
Implementation
hace 2 meses
DT2a
Install EV charging stations at nonresidential public parking areas within unincorporated Yolo County.
Implementation
hace 2 meses
DT2e
Apply for State grants to fund the installation of EV chargers within locations designated by the forthcoming countywide ZEV Action Plan.
Implementation
hace 2 meses
EB1a
Implement energy efficiency retrofits across County facilities, including the installation of cool roofs and replacement of all incandescent and fluorescent lighting with LED lighting.
Implementation
hace 2 meses
EB2a
Require all natural gas appliances within County buildings be replaced with electric appliances, including retrofitting the HVAC system to include heat pumps and/or combined heat and power systems (CHP).
Implementation
hace 2 meses
EB3a
Install photovoltaic (PV) solar panels at County-owned facilities.
Implementation
hace 2 meses
EB3b
Secure funding to upgrade existing municipal building electrical infrastructure to support building electrification, battery storage integration, etc.
Planning
hace 2 meses
EB3c
Install battery storage at County facilities with onsite renewable generation to increase use of zero-emission electricity.
Implementation
hace 2 meses
EB4a
Enroll all Yolo County municipal electric accounts not covered by existing County solar/renewable projects into UltraGreen via Valley Clean Energy (VCE) or the similar Pacific Gas and Electric Company “Green Saver” program.
Completed
hace 2 meses
SW2c
Amend procurement policy to prioritize rubberized asphalt made from recycled tires collected at landfill for County road improvement projects.
Implementation
hace 2 meses
OFR1a
Identify types of commercially-available electric/zero emission off-road equipment and develop a plan and funding strategy to transition County owned/operated equipment by 2030.
Implementation
hace 2 meses
OFR1d
Replace gas-powered landscape equipment with zero-emission landscaping equipment at County facilities and install charging facilities where needed.
Not started
hace un mes
NWL2a
Restore Wetlands.
Implementation
hace 2 meses
NWL2b
Restore Riparian Forests.
Implementation
hace un mes
NWL2c
Restore Native Grasslands.
Not started
hace un mes
NWL2e
Hire a Yolo County Open Space Technician.
Planning
hace 2 meses
NWL3a
Implement Grassland Stewardship in County Public Lands.
Planning
hace un mes
NWL3b
Implement Forest and Woodland Stewardship in County Public Lands.
Implementation
hace un mes
NWL4a
Protect Against Wetland Habitat Loss.
Not started
hace un mes
NWL4d
Protect Intact Habitat from Conversion.
Not started
hace un mes
HC1a
Develop a network of community resilience centers based in existing community hubs.
Planning
hace 5 meses
HC1b
Seek grant funding to retrofit existing community hubs with climate-resilient improvements.
Planning
hace 2 meses
HC1c
Seek grant funding to support and expand Cooling Center program.
Planning
hace 2 meses
HC1d
Explore architectural and engineering design requirements needed to expand hours of community centers on hot days that do not meet the extreme heat threshold.
Planning
hace 2 meses
HC3f
Identify opportunities and pursue grant funding to install touchless water refill stations at public facilities and parks.
Planning
hace 2 meses
HC4a
Work with Yolo Transportation District to improve bus stops and stations, adding shade structures and water stations.
Not started
hace 2 meses
HC4b
Partner with local CBOs to provide weatherization resources and outreach to residents.
Implementation
hace 2 meses
HC4g
Investigate the potential for the County to complete reliable broadband internet access across unincorporated Yolo County.
Not started
hace 2 meses
HC5f
Update critical facilities to increase climate resilience.
Planning
hace 2 meses
HC7c
Pursue grant funding to install cool pavements in place of dark pavements on County property.
Not started
hace 2 meses
HC7d
Pursue grant funding to replace roofs on County and service provider facilities with reflective materials that meet or exceed current code or with green roofs.
Not started
hace 2 meses
HC7g
Develop community canopy program to expand tree planting, prioritizing areas experiencing the urban heat island effect.
Not started
hace 2 meses